The Deadline activity contains two branches by default: a primary branch and deadline branch.
Tip: You can add additional deadline branches.
A deadline branch defines the routing criteria for an entry after a timeout period is met. The activities contained in a deadline branch will only be performed if:
To configure a deadline branch
For further help or feedback, please see the Laserfiche Support Site. | © 2010 Laserfiche, Inc. All Rights Reserved. |